Remediation takes material out. Reconstruction puts the building back — and running both on one file removes the handoff where a rebuild trade arrives with no record of what was behind the wall.

Dispatch — 24 hours

(613) 239-4728

Answered at any hour, including through storm events. You are told a real attendance window on the call.

Aerial view of a fire-gutted brick building with its roof burned away, exposed floor framing and debris inside the standing walls, enclosed by temporary site fencing
Structure taken down to rebuild fromHMRS job site

When this applies

  1. 1Abatement has finished and the space needs drywall, flooring, and finishes.
  2. 2A water loss removed subfloor, insulation, and wall assemblies.
  3. 3A fire has left a unit needing structural and finish rebuild.
  4. 4A biohazard removal has stripped a unit that has to be re-let.
  5. 5A tenant turnover is blocked behind remediation work.
  6. 6An insurer has approved a scope to return the space to pre-loss condition.
  7. 7A demolition has cleared a site that now needs making good.
  8. 8Remediation and rebuild are being tendered together to avoid a gap.

How reconstruction runs on a remediation file

  1. 01

    Carry the remediation record forward

    What was removed, why, and to what standard it was cleared. A rebuild trade brought in cold has none of this and has to rediscover it — or, more often, does not, and closes a wall over a condition nobody documented.

  2. 02

    Confirm clearance before anything closes

    Nothing gets covered before the clearance or verification appropriate to the work is in hand. On a Type 3 asbestos operation that means the clearance air test has passed. Closing a wall over an uncleared area is the failure that is most expensive to undo.

  3. 03

    Scope to pre-loss condition

    The standard on a restoration file is the condition before the loss, not an upgrade. Where an owner wants an improvement, it is scoped and priced separately so the claim portion stays clean and the adjuster is not asked to fund a betterment.

  4. 04

    Structure, envelope, then finishes

    Framing, subfloor, and any envelope repair first, then mechanical and electrical make-good, then insulation, drywall, and finishes. Sequenced so nothing is opened twice.

  5. 05

    Coordinate around occupancy

    In an occupied building, work is sequenced around tenants and around the trades who still need access. Corridor protection and dust control stay in place through the rebuild rather than coming down when the abatement enclosure does.

  6. 06

    Close the file

    One closeout covering removal through rebuild: scope, clearance documentation, photo progress, and the reinstatement record. That is what a property manager passes upward and what an adjuster closes a claim against.

Why property managers and adjusters call HMRS

One file from removal to reinstatement
The remediation record carries into the rebuild rather than being handed to a trade who never saw the condition behind the wall.
Nothing closes over an uncleared area
Clearance or verification appropriate to the work is in hand before a wall goes back up. This is the failure that costs the most to reverse.
Pre-loss condition scoped separately from betterment
The claim portion stays clean and improvements are priced on their own, so the adjuster is not asked to fund an upgrade.
Containment stays up through the rebuild
In occupied buildings, dust control and corridor protection do not come down when the abatement enclosure does.

Common questions

01Is this general contracting?

No. This is reconstruction on remediation and restoration files — putting back what abatement, water, fire, or biohazard work had to remove. If you are planning a discretionary renovation with no remediation involved, a general contractor is the right call and HMRS will say so.

02Why not just hire a separate rebuild contractor?

You can, and on a large project it is sometimes the right structure. The cost of splitting it is the handoff: the rebuild trade did not see what was behind the wall, does not have the clearance documentation, and is not accountable for whether the area was cleared before it closed. On a single file that gap does not exist.

03What does pre-loss condition actually mean?

The condition the space was in immediately before the loss — same materials and finishes or their reasonable equivalent, not an upgrade. It is the standard an insurer funds. Improvements beyond that are legitimate but get scoped and priced separately.

04Can reconstruction start before clearance?

Not on the affected area. After a Type 3 asbestos operation the enclosure stays up until the clearance air test passes, and nothing gets closed over an uncleared space. Work outside the affected area can often proceed in parallel, which is usually where the schedule is recovered.

05Who deals with the insurer on the rebuild scope?

HMRS prepares the scope and documentation for the adjuster to work from and raises scope changes as they are found rather than at invoicing. The policyholder holds the claim; the file is written so it can be moved on.

06How is a tenant turnover handled?

Sequenced to the date you need the unit back, with the remediation and rebuild planned as one schedule rather than two. Where the turnover date cannot be met, you are told early enough to act on it rather than at the point it is missed.

07Do you work in occupied buildings during reconstruction?

Yes, and that is most of the work. Corridor protection, dust control, and access management stay in place through the rebuild. The mistake to avoid is treating the end of abatement as the end of containment.

08What if more damage is found once the wall is open?

It gets raised at the point it is found, in writing, with what it changes about scope and schedule. Discovering it and carrying on is how a rebuild ends in a dispute at invoicing.